Wika GCS-1 Bedienungsanleitung Seite 15

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 76
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 14
15WIKA operating instructions gas cylinder scale model GCS-1
GB
11145676.05 11/2011 GB/D/F/E
A
B
After the adjustment, check that the system is functioning correctly.
Recommended recalibration cycle: 1 year
7. Adjustment of zero point / span
Preparation
In order to access the zero point and span potentiometers, unscrew the protective
cap using a screwdriver (see gure A).
Introduce a reference mass which is at least 3 x as accurate as the given accuracy.
Zero point
Remove the load from the gas cylinder scale.
By adjusting the signal to 4 mA, the zero point can be set (see gure B).
Span
Set the span by loading the scale with the appropriate reference mass and adjusting
the signal to 20 mA.
Check the zero point.
If the zero point is not right, repeat the procedure.
Screw the sealing cap with seal back in, in order to close the potentiometer entry.
7. Adjustment of zero point / span
Seitenansicht 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 75 76

Kommentare zu diesen Handbüchern

Keine Kommentare